Screenshot_1

Supplying and building an office site for a engineering team, increasing the capacity of the mine.

Key Points

  • Designed the site and manufactured the prefab units
  • Constructed the 6 office units
  • Site preparation and ground works
  • Installation of electrical equipment, inc ACs.